METROPOLITAN LINE UPGRADES
-
Complete overhaul of foliage throughout the route
-
Terrain textures updated throughout the route
-
Updated grass textures on various custom assets
-
Numerous updates to the stations throughout the route, such as model and texture refinements and shadow baking
-
Major update of Kings Cross St Pancras Underground station
-
Major update of Hillingdon station
-
Croxley station has been fully updated
-
Dollis Hill station is now a custom asset
-
Disused Thameslink Line area at Barbican enhanced
-
Neasden Depot shed can now be driven through in scenarios.
-
Different platform passenger models
-
Station night lighting updated throughout the route
-
Wooden slipper running boards added with extra rail detail on all pointwork throughout the route
-
Earthing cables added to rail gaps throughout the route.
-
New track throughout the route with newly included third and fourth rails
-
Trackwork around pointwork and rail gaps has been refined to allow smooth slopes for S Stock pick-up shoes
-
Added new Metropolitan yellow circuit cabinet models and updated the other current models
-
New London Underground-style buffer models created
-
Reworked Overhead Line Equipment (OHLE) for the Midland Mainline, West Coast Main Line, North London and Thameslink lines as seen on the route
-
Main line speed signage has been updated to new models
-
New apartment blocks throughout the route
-
Major update of the Wembley, North Harrow and West Hampstead areas
-
Improved scenery for industrial and commercial areas throughout the route.
-
Several house models updated in various locations along the route
-
Updated tunnel entrances at Watford Curve junction.
-
New M25 motorway bridge model
-
Bridges replaced with new models throughout the route.
-
New car park building model for the Amersham station area
-
Custom Homebase store model created next to Finchley Road station
-
More track side clutter added
-
More clutter added to commercial and industrial areas along the route
SCENARIOS
14 scenarios are included with this software:
-
Duty 904 – Parts 1-4
-
Duty 916 – Parts 1-2
-
Duty 936 – Parts 1-8
To use these scenarios you will need to have EITHER the Just Trains
S7+1 Advanced OR S8 Advanced Underground Stock add-on installed in Train Simulator.
(UD) Duty 904 Part 1
Part 1 of 4: Drive train 434 from Uxbridge Sidings to Uxbridge platform 4 in preparation for the day’s service.
Difficulty: Easy
Duration: 10 minutes
(UD) Duty 904 Part 2
Part 2 of 4: Drive train 434 from Uxbridge to Baker Street on a glorious morning in August 2018.
Difficulty: Easy
Duration: 40 minutes
(UD) Duty 904 Part 3
Part 3 of 4: Drive train 434 from Baker Street to Chesham on a glorious morning in August 2018.
Difficulty: Easy
Duration: 55 minutes
(UD) Duty 904 Part 4
Part 4 of 4: Drive train 434 from Chesham to Harrow-on-the Hill on a glorious morning in August 2018.
Difficulty: Easy
Duration: 30 minutes
(UD) Duty 916 Part 1
Part 1 of 2: Drive train 413 from Harrow-on-the-Hill to Amersham on a damp Sunday morning in September 2018.
Difficulty: Easy
Duration: 35 minutes
(UD) Duty 916 Part 2
Part 2 of 2: Drive train 413 from Amersham to Harrow-on-the Hill on a damp Sunday morning in September 2018.
Difficulty: Easy
Duration: 40 minutes
(UD) Duty 936 Part 1
Part 1 of 8: Drive train 424 from Harrow-on-the Hill to Watford.
Difficulty: Easy
Duration: 20 minutes
(UD) Duty 936 Part 2
Part 2 of 8: Drive train 424 forming the 1518 service to Aldgate.
Difficulty: Easy
Duration: 55 minutes
(UD) Duty 936 Part 3
Part 3 of 8: Drive train 411 forming the 1632 service to Watford. You will work as far as Harrow-on-the-Hill, where you will be relieved for your meal break.
Difficulty: Easy
Duration: 40 minutes
(UD) Duty 936 Part 4
Part 4 of 8: Drive train 442 frOm Harrow-on-the-Hill to Uxbridge.
Difficulty: Easy
Duration: 27 minutes
(UD) Duty 936 Part 5
Part 5 of 8: Drive train 442 from Uxbridge to Baker Street.
Difficulty: Easy
Duration: 50 minutes
(UD) Duty 936 Part 6
Part 6 of 8: Drive train 442 from Baker Street to Watford.
Difficulty: Easy
Duration: 45 minutes
(UD) Duty 936 Part 7
Part 7 of 8: Drive train 442 from Watford to Amersham on an empty stock movement to position yourself to work back to Watford Siding 24.
Difficulty: Easy
Duration: 20 minutes
(UD) Duty 936 Part 8
Part 8 of 8: Your shift is coming to an end. The sun has almost set and all you need to do now is take train 442 out of service to Watford Siding 24.
Difficulty: Easy
Duration: 20 minutes